| Client: |
City of St. Thomas |
| Project: |
CIPP MH to MH lining, lateral relining and spot repairs. Contracts 08-227A and 08-233-01 |
Date: |
April 2003 |
| Contact: |
Mr. Burt Long |
Cost: |
$440,000.00 |
| Phone: |
519-631-1680 |
| Description: |
CIPP relining of 200-250 mm dia. sewer lines, over 40 spot repairs and the inspection and relining of private drain connections. Included pipe cleaning and CCTV inspection |
 |
| |
| Client: |
City of Toronto |
| Project: |
MH to MH CIPP Relining, Contract #02D3&4-310WP |
Date: |
March 2003 |
| Contact: |
Mr. John Seretis |
Cost: |
$1,500,000.00 |
| Phone: |
416-395-6370 |
| Description: |
Manhole to manhole CIPP relining of over 5000 lm of sewer lines from 200 to 1050 mm dia. Included pipe preparation, bypass pumping, pre and post CCTV inspections and reinstatement of over 500 service connections. |
 |
| |
| Client: |
City of Toronto |
| Project: |
MH to MH CIPP Relining, Contract #02D1-511WS |
Date: |
September 2002 |
| Contact: |
Mr. Frank Csenkey |
Cost: |
$940,000.00 |
| Phone: |
416-394-8440 |
| Description: |
Manhole to manhole CIPP relining of over 3000 lm of sewer lines from 250 to 600 mm dia. Included pipe preparation, bypass pumping, CCTV inspection and reinstatement of over 375 service connections |
 |
| |
| Client: |
City of Westmount |
| Project: |
MH to MH CIPP Relining, Contract #PW-2001-07 |
Date: |
September 2002 |
| Contact: |
Mr. Bert Porporino |
Cost: |
$754,000.00 |
| Phone: |
514-989-5244 |
| Description: |
Cleaning, pipe preparation, CIPP lining of over 2300 lm of sewers, some with very steep gradients. Reinstatement of 50 laterals. |
 |
| |
| Client: |
District of Muskoka |
| Project: |
No Dig Sanitary Sewer Rehabilitation |
Date: |
March 2001 |
| Contact: |
Kevin Austin |
Cost: |
$182,000.00 |
| Phone: |
705-645-6764 |
| Description: |
Project required chemical grouting, CIPP spot repairs, CIPP lining and manhole rehabilitation. Included pipe preparation and the removal of calcite, roots and protruding services, and pre & post CCTV inspection. |
 |
| |
| Client: |
City of Winnipeg |
| Project: |
2000 Sewer Cleaning & inspection - Winnipeg |
Date: |
October 2000 |
| Contact: |
Brian Peter |
Cost: |
$395,000.00 |
| Phone: |
204-453-2301 |
| Description: |
Cleaning and CCTV inspection of 19,000 linear meters of combined sewers- Using WRC Manual of Sewer Condition Classification, Manhole Inspections, CB cleaning. |
 |
| |
| Client: |
City of Ottawa |
| Project: |
City of Ottawa Spot Repair Program |
Date: |
October 2000 |
| Contact: |
Noel Finn |
Cost: |
$125,000.00 |
| Phone: |
613-244-5300 x3331 |
| Description: |
Supply and installation of approximately 70 CIPP spot repairs. Repairs ranging in size from 8" to 18" diameter, 3' to 25' in length. Included site preparation and pre/post repair CCTV inspection. |
 |
| |
| Client: |
Region of Ottawa-Carleton |
| Project: |
Sewer Rehabilitation Program |
Date: |
October 2000 |
| Contact: |
Max Ross |
Cost: |
$1,084,000.00 |
| Phone: |
613-560-6053 |
| Description: |
Installation of over 500m of 30" and 36" CIPP liner using pull-in rather than inversion methodology. Included pipe preparation. Manhole reconstruction. |
 |
| |
| Client: |
City of Ottawa |
| Project: |
CIPP Lateral Relining |
Date: |
April 2000 |
| Contact: |
Luc Dugal |
Cost: |
$93,000.00 |
| Phone: |
613-798-9899 |
| Description: |
CIPP relining of 35 house laterals from the clean-out to the city main. The liner covered the transition from 4" to 6". Included pre/post CCTV inspection, heavy root removal with 15000 psi flusher unit prior to installation. |
 |
| |
| Client: |
Regional Municipality of Ottawa-Carleton |
| Project: |
Rideau River Collector Phase 2 |
Date: |
February 1999 |
| Contact: |
Ziad Ghadban |
Cost: |
$1,400,000.00 |
| Phone: |
613-560-6053 x2663 |
| Description: |
Extensive chemical sealing project for over 7,000m of combined sewer collector, ranging in size from 1220mm to 2130mm and up to 10m in depth. Replacement of 13 maintenance structures. Included extensive cleaning, preparation and CCTV activities. |
| |